Latest Posted Projects in Architects

NileTasker /Projects /Business & Admin /Architects

Keyword:
Minimum Budget:
Maximum Budget:
Ending In:
  • Budget: $19,999.00
  • Proposals: 0
  • 18669 days, 23 hours, 8 min left

IMPORTANT: PLEASE READ THE FULL CHALLENGE BRIEF THAT CONTAINS ALL THE CHALLENGE AND SUBMISSION REQUIREMENTS AND RULES CHALLENGE BRIEF (Last updated June 2, 2022): https://app.box.com/s/zzwpotazffkbfldb8sv3ejvpx2c3f6lo REGISTRATION FORM: https://docs.google.com/forms/d/e/1FAIpQLScSqYdODBg4-DYaT2WmG98r1GO53gyAd4OWehr926O5T95FxQ/viewform?usp=sf_link FAQ: https://app.box.com/s/p2wxgkaxtsyajt6pblz8yb9mf0d7mhs5 WEBINAR RECORDING: https://youtu.be/4l3bA_SaKDo ************************************************* AFTERSHOCK: NASA SHOCK PROPAGATION PREDICTION CHALLENGE Do you have expertise in physics, mechanical engineering, and/or data science? If so, this challenge […]

Posted on: 2nd Feb 2023 Verified User

  • Budget: $250.00
  • Proposals: 0
  • 18640 days, 17 hours, 26 min left

The sculpture is 50ftLx25ftWx30ftH. It will be placed outdoor in Black Rock City Desert, Nevada. It is made of parallel acrylic panels (see attachment). The sculpture is still in approval process and I am making the final proposal. I do have a deadline by Jan 19th. For this proposal, I need your expertise on 1) […]

Posted on: 4th Jan 2023 Verified User

  • Budget: $250.00
  • Proposals: 0
  • 18639 days, 14 hours, 39 min left

We are looking for an expert to check our structural layouts and run the required calculations. Experience in Steel (LGS, Black Steel, …) For those who are interested, please share your prequalification documents via messages.

Posted on: 3rd Jan 2023 Verified User

  • Budget: $250.00
  • Proposals: 0
  • 18638 days, 15 hours, 39 min left

I have a garage slab that’s going to take over 24” inches of [login to view URL] I’m looking for is a structural/rebar design that I can summit into the county office.

Posted on: 2nd Jan 2023 Verified User

  • Budget: $350.00
  • Proposals: 0
  • 998604 days, 19 hours, 59 min left

Elevations – ( Current )side St Parnell St Elevation of Building – ( Proposed ) Parnell St Elevation with a coffee window on the side wall where the machine is.

Posted on: 30th Nov 2022 Verified User

  • Budget: $500.00
  • Proposals: 0
  • 998603 days, 1 hours, 1 min left

I have a DA Approved to refurbish 4 apartments plus new 5th apartment above shops on the Main Street in Goulburn. For my Construction Certificate I have an old school architect working with pen and paper helping me, I do have CAD drawing to date. We need PCA, DDA drawings is this something you can […]

Posted on: 28th Nov 2022 Verified User